Generate a report

Menu → Reports → Generate a report

Generate a report is a single catalog of all OmniMES reports. The reports are divided into sections: Machines and locations, Production, Stock, Energy, Traceability, Maintenance and BI dashboards. Each catalog report is a type and a filter (period, plant, line, resource, product, status). You can show the same report on screen, download it as CSV, send it by e-mail, save it to the Generated reports archive or save it as a recurring report.

Reports are calculated by the same functions as the screens the data comes from: machine reports - the same as Analyse → Work time and OEE, the Pauses and downtime by reason report - the same function as the loss Pareto, and Order energy - the same as the order's Energy tab.


The former Production → Production reports screen is now part of this catalog. The old address opens Generate a report with the Production section, and the recurring reports from the former Recurring reports tab of Production reports are in Recurring reports.

Choosing a report

  1. Click a section on the bar above the catalog, e.g. Machines and locations. A short description of the section is shown below the bar.

  2. Click a report card. Its description and filters appear below the catalog.

  3. Set the filter and click Show report.

The section and the report are stored in the page address - a link to the page opens the same report directly.

“Machines and locations” section

Machine reports work without orders - it is enough that the machine has a state signal in the Status configurator. They are the reports for plants that use OmniMES for machine monitoring.

Report

Contents

Machine time and availability

run time, downtime, failures, planned stops, micro-stops, availability and MTBF of every machine of a plant, a line or a single machine (described below)

Pauses and downtime by reason

machine stops from the signal (reason from a rule, from the operator or corrected manually) and operator pauses: minutes, count and share (Pareto), with planned stops and micro-stops

OEE (ISO 22400)

availability, effectiveness, quality and OEE of resources

OEE by shift

availability, effectiveness and quality during each shift of the resource calendar

MTBF and MTTR (reliability)

number of stops and failures, mean time to repair (MTTR) and mean time between stops (MTBF)

“Machine time and availability” report

Filters: Period, Machine plant, Line and Machine (a plant, a line or a single machine). The report has a row per machine and a Total row for the selected location.

Column

Meaning

Work — whole period [h]

all the time in the work state, also outside shifts - the same as on the Work time chart

Planned time [h]

shift time from the calendar minus planned stops; without a shift calendar - the time in which the machine had a state

Production time [h]

work within the planned time, including micro-stops

Unplanned downtime [h], Failures [h], Planned stops [h], Micro-stops [h]

downtime by type

No machine state [h]

time in which the machine had no state at all (switched off, no data): with a shift calendar - within the shifts, and it lowers availability; without a calendar - for information only

Availability

production time / planned time

Effectiveness, Quality, OEE

only for machines with quantity reports from the Production module; without reports these columns are empty

Stops, Failures, Micro-stops, Planned stops

numbers of events started in the period

MTTR [min], MTBF [min]

MTTR = downtime / number of stops, MTBF = MTTR + MTTF

State source

machine signal, operator panel or mixed

Planned time

basis of the planned time: shift calendar or time with machine state

A machine without a state signal (e.g. only an energy meter) has a row with the note no state signal and is not included in the totals. The report period can be at most 92 days.

When a machine has no shift calendar, a note appears above the table: “No shift calendar — planned time = time with machine state (time without state does not lower availability); set shifts in Production setup → Resource calendar.” How the system calculates availability with and without a calendar is described in the Work time and OEE chapter.

“Production” section

Reports of the Production module - orders, stages, lots and operator reports.

Report

Contents

Order report

a document of a single order for the archive (described below)

Order progress

good and scrap quantities, current stages, due date and forecast end, operator working time [man-h]

Orders by stage

order operations by stage: resource, quantities, status and plan

Work in progress (WIP)

lots and quantities waiting and in process at each stage (current state)

Production in period

good and scrap in the period - by day, product or resource (Group by)

Finished and packed goods

good units from the last routing stage

Scrap by reason

scrap by defect code with percentage share (Pareto)

Lot curing

lots at timed stages: start, earliest end, ended early

Orders at risk and overdue

open orders at risk and overdue (current state)

Plan adherence

plan vs actual for operations, end deviation

Operation history

production event log: who did what and when in an order and lot (filter by order, lot, event type and resource)

OEE by product

availability, effectiveness and quality while the product lots run on resources

Order report


The order report is a document of a single Production module order, saved to the Generated reports archive.

  1. In the Production section click the Order report card.

  2. In the Order field choose the order (the list shows the number, product and status; drafts are not listed because they have no work yet).

  3. Optionally enter a Name - without it the report is called “Order <number>”.

  4. Click Generate order report.

The report is generated in the background. After a moment you will find it in Generated reports (type Report - Production order) - the message below the button has a link to the list. Save as recurring report below the form opens the Add recurring report window with the selected order.

What the order report contains:

  • period - from the start of the first lot of the order to the end of the last one (an order in progress - until the moment of generation),

  • location - the resources of the order operations,

  • quantities - ordered, produced (good and scrap) and scrap from the order,

  • times, availability, effectiveness, quality and OEE according to ISO 22400 - from the run periods of the order lots on the resources and the stage reports of these lots, the same way as OEE by product,

  • cycle time norm - the routing average weighted by quantity,

  • energy and cost - from the OmniEnergy meters of the order machines (cost only with a tariff).

“Stock”, “Energy” and “Traceability” sections

Report

Contents

Material stock levels

material stock, minimum stock and estimated value at the standard price - not an accounting valuation (current state)

Stock movements

register of receipts, issues, returns and adjustments

Order energy

orders finished in the period: kWh, kWh per good unit, net energy cost and CO2

Energy per product

kWh per unit weighted by quantity and the spread between orders (min, max, deviation, coefficient of variation)

Energy and machine states

a shared chart of machine states and energy consumption, idle energy, average and maximum power, cost and CO2 of a machine, a line or a plant (described below)

Lot traceability, Recall register, Lot mass balance, Lots close to expiry, Genealogy completeness, Material loss of orders

traceability reports - described in the Lots and genealogy chapter

The standard price and the minimum stock of a material are set in the Item master.

“Energy and machine states” report

The report shows machine states and the machine energy consumption on one time axis - you can see how much energy the machine takes at work and how much during downtime, failures or outside work. It works without orders: the machine needs a state signal (Status configurator) and an OmniEnergy energy meter.

Filters: Period, Machine plant, Line, Machine (none selected - all machines with an energy meter) and Energy profile step - Automatic (up to 2 days - 15 minutes, up to 31 days - 1 hour, longer - 1 day), 15 minutes, 1 hour or 1 day. The report covers at most 92 days and 50 machines.

Part of the result

What it shows

Tiles

Energy, Idle energy (with its share of the energy), Average power at work, Average power outside work, Max. 15-min power (the largest quarter-hour consumption × 4), Net energy cost (when the machine has a tariff) and CO2 (when the carrier has an emission factor)

Machine states

a bar for each machine: Work, Unplanned downtime, Failure, Planned stop, Setup; grey background - off or no data. Hovering shows the state and the hours

Energy consumption profile

energy bars in each interval (15 min, 1 h or 1 day) split by machine state - the same colours as the state bar. Show as a table replaces the chart with a table of values

Energy by machine state, Time in states

kWh and hours in each state

Table

a row per machine: work, downtime and off [h], energy, energy at work and idle energy, idle energy share, average power at work and outside work, max. 15-min power, cost and idle energy cost, CO2, state source and Data quality (e.g. meter reset, gap in readings); the footer has the location total

Idle energy = energy used during downtime (unplanned, failures, planned stops and setups) and while the machine is off. It is calculated by the same function as the order Energy tab, and the machine energy is the same as in the OmniEnergy reports (meters, multipliers, resets). A machine without a state signal has all its energy in the No machine state state.

Download PDF saves the report with the chart (A4 landscape), and Send by e-mail and the recurring report attach this PDF to the message (the indicators and the table are in the body).

“Maintenance” section

Report

Contents

Failures and MTBF/MTTR

for each machine: requests in the period, failures, failure time, MTTR, MTTF, MTBF and availability from failure requests - the same definition as the telemetry MTBF/MTTR

Inspection compliance

inspection orders due in the period: due date, completion, on time or late, delay, technician, work

Maintenance cost

for each machine: orders finished in the period, labour hours, labour cost (when the maintenance settings have a rate) and parts at the standard price

Module description - the Maintenance chapter.

“BI dashboards” section


BI dashboard report creates a snapshot of a Redash dashboard for the selected period. In the form:

  1. Optionally enter a Name (without it the system generates one).

  2. Choose the dashboard in Select dashboard for snapshot.

  3. Set Date from (snapshot) and Date to (snapshot).

  4. Click Generate new report.

The task goes to a queue and runs in the background - usually a few to a dozen or so seconds, longer when the dashboard queries are slow (limit: 4 minutes). You download the finished report from Generated reports as PDF, PNG, MHTML or HTML. When the dashboard does not load within the limit or the task is interrupted (e.g. a server restart), the report gets an error status with the description in its name - order it again.

The server takes the snapshot only from the Redash set in General configuration (Redash tab). A dashboard at another address is rejected with a message.

You can also create a BI dashboard report on the Dashboard (when it shows a Redash dashboard) - with the Archive as report button.

Running a catalog report

Period: Today, Yesterday, Last 7 days, Last 30 days, Current week, Previous week, Current month, Previous month or Custom range (with a start and an end date). A report without a period (e.g. Work in progress (WIP), Material stock levels) shows the current state.

After you click Show report, the period, the generation time and the number of rows are shown above the result, and for many reports also a note on how the values are calculated. Click a column header to sort; the table footer has totals and a summary is shown below the table.

Buttons below the filters:

Button

What it does

Show report

calculates the report and shows the result on screen

Download CSV

downloads a CSV file with the same result

Download PDF

downloads the report as a PDF (A4 landscape): header, period, note and table, and in the Energy and machine states report also the indicators and the chart

Send by e-mail

opens the Send report by e-mail window: enter the Recipients (separated by commas or each on a new line), optionally tick Attach CSV file and click Send report. The message has the table in its body

Save to archive

saves the current result to Generated reports (described below)

Save as recurring report

opens the Add recurring report window (Recurring reports screen) with this report, filter and period - add the recipients, set the schedule and save (see the Recurring reports chapter)

Sending uses the system mail settings (General configuration).

Reports generated in the background

Download PDF and Send by e-mail always, and in reports that take longer for a long period (Machine time and availability, Energy and machine states, OEE by shift, MTBF and MTTR) also Show report, Download CSV and Save to archive - the report is generated in the background on the server. A progress bar with the current stage appears below the buttons: Queued on the server…, Computing the report, Creating the PDF, Sending the e-mail.

Stay on the page - the result appears by itself: the report on screen, the file is downloaded, and after sending you see a confirmation with the recipients (the Send report by e-mail window closes right after you click Send report). Until the task ends the other report buttons are inactive. When the task fails, you see a message with the reason, e.g. the period limit exceeded, no browser on the server (PDF) or mail not configured.

Saving to the archive

  1. Click Save to archive.

  2. In the Save to archive window check the Report name (by default the name of the catalog report).

  3. Click Save to archive.

The report with the current results goes to Reports → Generated reports as Report - from catalog: with the table, CSV and print, without recalculation. Saving requires write access to reports - without it the button is not shown.

Limitations

  • OEE by shift and OEE by product are calculated live - for at most 31 days. Machine time and availability and MTBF and MTTR - for at most 92 days.

  • Energy reports include only orders finished in the period and require OmniEnergy meters on the order machines; the cost is empty when the machine has no tariff. With a very large number of orders, the report calculates some of them and says so in the note - narrow the period or the filter.

  • Effectiveness, quality and OEE in machine reports require quantity reports from the Production module - without them the report shows times and availability.

  • Energy and machine states - at most 92 days and 50 machines; a longer period with the 15-minute step selected is calculated with a 1-hour step (at most 800 chart intervals). The PDF requires a browser on the server (included in the OmniMES installation) - without it the e-mail is sent without the PDF.